Project overview
Riyadh Villa A
Compare planned quantities with material received, used and wasted directly from site.
Consumed cost
0
Based on recorded entries
Waste cost
0
0% of used + waste
Recorded stock value
0
Received minus used, waste and returns
Risk items
0
Above planned or waste limit
Quick site entry
Designed for entry in under 15 seconds
Prototype data stays on this device. No account or server is used.
Material reconciliation
Planned versus received, used, waste and remaining
| Material | Planned | Received | Used | Wasted | Balance | Variance | Status |
|---|
Recent entries
A simple timestamped site audit trail
Movement register
Search, audit, correct and export every recorded movement
0Matching entries
0Filtered used cost
0Filtered waste cost
0Evidence files
| Date | Material | Movement type | Quantity | Work area / activity | Source / reference | Cost | Actions |
|---|
Material plan
Define planned quantity, cost and acceptable waste
Download the Excel template, fill one material per row, then import the completed file. Existing material names are updated rather than duplicated.
Procurement alerts
Suggested orders are calculated from the remaining planned requirement and recorded stock.
0Urgent items
0Pending items
0Suggested order value
0%Stock coverage
| Material | Current stock | Minimum stock | Remaining requirement | Suggested order | Lead time | Required by | Status |
|---|
Projects
Switch the active site or create another project
Project report
Project report
Report filters
Choose a period and work area, then print or export the result.
0Received cost
0Consumed cost
0Waste cost
0%Waste rate
Material performance
Selected-period consumption compared with the project plan
| Material | Planned | Received | Used | Wasted | Waste rate | Consumed cost |
|---|
Work-area breakdown
Used and wasted cost grouped by work area
| Work area / activity | Used | Wasted | Total cost | Entries |
|---|